Published March 17, 2021 at 4160 × 3120 in High-Hazard Project’s Foundation of Safety The pile-driving operation required visual and radio signals because the crane operator could not see the work, which was 15 feet below. The pile-driving operation required visual and radio signals because the crane operator could not see the work, which was 15 feet below.