Published March 17, 2021 at 2652 × 3536 in High-Hazard Project’s Foundation of Safety The piles for the bridge foundation used specialized rigging to ensure the correct 1:3 angle. The piles for the bridge foundation used specialized rigging to ensure the correct 1:3 angle.