Pile-driving-crane

The pile-driving crane for the project required assembly in one lane of the road at the project, and needed to be “walked” under power lines.

The pile-driving crane for the project required assembly in one lane of the road at the project, and needed to be “walked” under power lines.

The pile-driving crane for the project required assembly in one lane of the road at the project, and needed to be “walked” under power lines.