Published March 17, 2021 at 3536 × 2652 in High-Hazard Project’s Foundation of Safety The pile-driving crane for the project required assembly in one lane of the road at the project, and needed to be “walked” under power lines. The pile-driving crane for the project required assembly in one lane of the road at the project, and needed to be “walked” under power lines.